Mr. Drauer
DIS Veteran
- Joined
- Apr 21, 2016
- Messages
- 1,093
the train (Sun Rail extension) that might be built in 10 years? why would that cause anything to be done now? the train is still a pie in the sky idea. they are trying to fund the PD&E Study, which is a 2+ year study, which would be followed by a multi-year design phase (unfunded at present) followed by right-of-way acquisition (unfunded) and a multi-year construction project currently estimated at $4 billion. No one is making any decisions based upon that right now.Maybe related to the train.