We stopped by the Wilderness Lodge on Saturday, December 3rd for a quick visit. I only took a couple pictures of the construction outside of Roaring Forks. This is the wall that is hiding the patio construction:
And they have frosted the windows near Roaring Forks so that you can't see what they are doing to the patio:
Then on Tuesday morning, Dec 6th, we booked a private water taxi from GF to FW for our breakfast at Trail's End. I asked the CM if he could take the boat past the construction at WL and he was happy to do it:
This is the cabin closest to the monorail and the least finished of all the cabins.
This one has some interior walls and you can tell that there will be a chimney.
It looks like a few of the trees are dying. There are a lot of trees in the courtyard area. The Trout Pass bar is to the right, the construction wall which blocks the view of the construction from the pool area is in the middle, and the new grill area is on the left.
This looks like it will be an open air patio.
This is probably the restaurant. The CM's on the boat said that there are job postings already for the new bar and grill. The marina is getting a new roof.
I posted a copy of these pictures to the Boulder Ridge thread.